Logistics & Heavy Lift — moving what matters, when it matters
We design and execute complex transport plans, heavy‑lift operations and customs strategies so equipment and materials arrive on time, intact and compliant — even to the most remote sites.
Overview
When clients engage us
- Oversize/overweight equipment requiring route surveys and permits
- Remote site deliveries with limited access and staging constraints
- Complex customs and import/export compliance across jurisdictions
How we deliver heavy‑lift and project logistics
- Site & route assessment — remote surveys, geotechnical checks and access planning to identify constraints and staging points.
- Lift engineering & method statements — engineering drawings, lift plans, jacking/rigging methods and safety assessments.
- Permits & regulatory clearance — secure oversize permits, police escorts, port and customs approvals across jurisdictions.
- Multimodal coordination — integrate sea, rail and road legs with transshipment and storage planning.
- On‑site execution & handover — local field teams manage offload, placement and acceptance testing with client sign‑off.
Risk reduction
Engineering controls, contingency plans and insurance coordination reduce exposure.
Schedule certainty
Integrated planning and buffer management keep critical path intact.
Regulatory compliance
Customs, permits and local regulations handled end‑to‑end.
Practical insights and best practices
- Early route engineering — identify pinch points and infrastructure limits before procurement to avoid costly rework.
- Staged deliveries — use intermediate storage and modular assembly to reduce on‑site handling risk.
- Local partner integration — engage trusted heavy‑lift contractors and port agents early to secure capacity and permits.
- Contingency planning — build alternate routes and spare parts lists into the plan for critical equipment.
Selected case studies
Heavy‑lift transport — Hydropower Project
Coordinated sea‑to‑site delivery of 120‑tonne turbines: route surveys, temporary bridge reinforcement and specialist jacking reduced on‑site installation time by 30%.
Outcome: on‑time installation • reduced site disruption
Customs & clearance — Mining equipment import
Managed multi‑jurisdiction customs clearance for critical spares, including pre‑lodgement of documents and bonded storage to avoid demurrage.
Outcome: zero demurrage • faster release